From raw material to the cost of the finished product.

In manufacturing, orders, materials, the shop floor and accounting all depend on each other. When one slips, the rest slip too. See below how these processes connect, using a garment factory as the example.

The examples come from garment production. The logic is the same elsewhere: capacity, materials, standards and cost.

Sample Figures, names and screens are for illustration. Every system is built around your processes.

01/06Planning

The order is in. Can we deliver it on time?

If an order is accepted without checking line capacity and material, the deadline slips or another order gets pushed back.

Orders, line capacity, stock and expected deliveries are all visible in one production plan.

The planner decides which order goes first.

Production plan · NovemberSample
1112131415161718Line 1T-shirtsLine 2PolosLine 3Hoodies
B-312 · 4,000
B-309 · 1,800
B-315 · 2,500
B-305 · 900
B-318 · 1,200
B-318 · 1,200
B-318 · 600
B-318 · 600

B-318 · hoodies, 1,200 pcs

DueNovember 17
FabricArrives November 15
TrimsIn stock
Line 3Finishes November 18

Risk of finishing 1 day late

PPlannerSplit the order across two lines, deadline kept

02/06Materials

Know about a material shortage before the work starts, not when it does.

If stock is only checked when production starts, the line stops and people stand idle.

Each order’s requirements are compared with material in stock and on the way. Any shortage shows up with its date.

Purchasing decides whether to speed up delivery or move the start.

B-315 · polos, 2,500 pcs · materialsSample
  • In stock
  • On the way

Piqué fabricneed 1,150 m

820 m400 m · Nov 14Needed

Cutting starts Nov 12: 330 m short

Buttonsneed 7,500 pcs

4,1004,500 · Nov 11Needed

Collars (rib)need 2,500 pcs

2,700Needed
Cutting startsNovember 12
Short330 m of fabric
PPurchasingAsked for delivery by November 11

03/06Usage and defects

Know which line is using more than the standard.

If actual usage and defects aren’t compared with the standard, overspending disappears into one big number at month end.

Usage and defects are compared with the standard by batch, shift and line. When something is off, the reason is requested.

The process engineer decides whether to change the standard or the process.

Fabric usage · per pieceSample
Line · shiftBatchStandardActualDefects
Line 1 · AB-312/040.29 m…0.30 m…1.1%
Line 1 · BB-312/050.29 m…0.29 m…0.9%
Line 2 · AB-309/020.33 m…0.34 m…1.4%
Line 2 · BB-309/030.33 m…0.38 m…3.8%Usage 15% over standard, defects 3.8% (other shifts 0.9–1.4%)

B-309/03 · Line 2, shift B

  1. Batch of 600 pcs: 600 × 0.05 m = 30 m of extra fabric
  2. Reason requested from the shift supervisor
  3. Answer: a new cutting pattern is being tested
PProcess engineerDecides whether to go back to the old pattern

04/06Shop floor

Know which stage an order is at without picking up the phone.

When progress is checked by phone, the information arrives late and the reasons for stoppages never get written down.

Each stage is marked complete on a tablet on the shop floor. Stoppage time and reason are recorded there too.

Reviewing stoppages and acting on them is the manager’s job.

Shop floor · todaySample
B-312 · T-shirts, 4,000 pcsDue: November 14
  1. Cutting4,000 / 4,000
  2. Sewing2,560 / 4,000
  3. FinishingStoppage: 40 min
  4. PackingWaiting

From the shop-floor tablet

  • 08:10Cutting finished: 4,000 pcs
  • 11:40Sewing: 2,560 pcs done
  • 13:05Finishing: steam press broken, 40 min stoppage
  • 13:45Work resumed

Who sees this status

  • SShop supervisor
  • SSales manager
PProduction managerReviews stoppage reasons every week

05/06Product cost

Cost each product from actuals, not estimates.

When product cost comes from month-end totals or a rough norm, it stays unclear which products actually make money.

Material, labor and the agreed share of overheads are combined per batch, so every batch has its own cost.

Decisions on pricing or revising standards stay with you.

Product cost · B-301Sample
Cost of one T-shirtUZS · batch B-301 closed
Plan
  • FabricActual usage, batch B-30118,400
  • Trims and threadIssued from stock2,100
  • LaborWork done, piece rate6,300
  • OverheadsAgreed allocation: machine hours3,200
Actual cost30,000
Plan28,500
Difference+1,500 UZS · +5.3%

How overheads are allocated is agreed with you.

06/06Overview

Orders, shop floor and cost in one chain.

When information sits in separate departments, the owner learns how things stand at month end or over the phone.

Orders, plan, stock, shop floor and cost are all visible from the same data.

The system shows what needs attention. The responsible manager decides.

Overview · factorySample
  1. 01OrdersB-318 added to the plan, deadline keptPlanned
  2. 02Purchasing330 m of fabric for B-315 expeditedPending
  3. 03Shop floorB-312: sewing 64%, stoppage loggedIn progress
  4. 04QualityLine 2 · shift B: defects 3.8%Under review
  5. 05WarehousePiqué: 820 m, 400 m on the wayUpdated
  6. 06FinanceClosed batch B-301: 30,000 UZSPlan +5.3%

Order B-312: one record

OrderPlanWarehouseShop floor

What needs attention

  • Line 2 · shift B: fabric usage 15% over standardPProcess engineer
  • B-315 is 330 m of fabric shortPPurchasing

Contact

Which process should we improve first?

Tell us how things work today. In the first conversation we will pin down the problem and the next step together.

Or leave a short request